Interior Design School - What Is It All About
It's possible to not fully grasp the design process if this is your first time working together with a designer on a commercial or home space. Residential Interior Designers In Gurgaon It can save you both time and money by understanding the entire project and each phase. It will be easier to understand your role in the interior design process and that of your co-workers.
Finding a design company you are comfortable with is the first step. Every design firm is different and each project will have its own set of phases. You might not need all of the phases for a small project. However, these are the main phases of any design project.
1. Schematic Design 2. Design Development
3. Construction documents
4. Bidding Phase
5. Construction Administration
Interior Design Stages - Explained
1. Schematic Design: This stage is the first in the design process. It is where the scope of your project is determined. This is the part of the design process that you, as the client, will be most involved in with the designer and sometimes even the architect. To ensure that the concept moves in the right direction, the designer (or architect) will provide rough sketches as well as show materials. This phase can take weeks or months depending on which firm you choose and how large the project is. If you don't know what kind of design you want, it can take longer. The design firm can guide you in this case.
2. Design Development: This stage is about turning concepts into actionable items. This stage helps to identify potential problems that might not have been obvious upfront. The initial architectural drawings and specifications for the material are created by an architect and interior designer firm. As the design firm needs your input to narrow down details and find solutions, you will be involved in this entire process. The next step in the construction process is when you have approved the direction of your design project.
3. Construction Documents: These are the final drawings created during the design development phase. They can now be turned into working documents and refined to meet code requirements. The specifications and all materials are completed. After this step is completed, the documents can be used to help build the project. This phase is technical and you won't have much involvement. The timeline will depend on the project scope.
4. Bidding Phase: The construction documents are sent out to potential builders so that they can prepare bids. A bid is an estimate of how much and how long it will take to complete your project. Except for reviewing the bids, you won't be heavily involved in this phase. This phase will be managed by your design firm. It all depends on the availability and timeline of the contractors. An initial bid for a residential design project can take up six weeks.
5. Construction Administration: The final phase is the manual work. Good design firms will make sure that deadlines are met and you have approved them before construction can begin. You are given the actual materials before installation. If you live off-site, you should be able make appointments to see the progress. During this phase, your interior designer should be available to answer questions and address any concerns. Your design project will be complete at the end of this phase.